In July of 2011, Flozone Services installed an Integrated Management System for CBL and Associates Properties at their location at the Coolsprings Galleria Mall. The installation was part of an overall mechanical service contract with the Mall through Lee Company, Mechanical Contractors of Franklin, Tennessee. They chose Flozone Services (a technology based non-chemical water treatment company) over previously well maintained traditional chemical treatment systems. Flozone Services provides substantial HVAC water and energy savings annually over former chemically treated systems.